XPERMITS
Pool permit expediting · Unincorporated Miami-Dade

You build the pool. We get it permitted.

X Permits prepares, files and tracks residential pool permits with Miami-Dade County, from the first package to the final inspection, so your crew stays on the job instead of in line.

Hablamos español. Service starts in unincorporated Miami-Dade; cities coming later.

Swimming Pool

Example
Category
55 · Swimming Pool
Folio
30-0000-000-0000
Authority
Miami-Dade County (unincorporated)
  • Notice of Commencement recordedDone
  • Master pool permitIssued
  • Electrical sub-permitIssued
  • Steel / pre-gunite inspectionScheduled
  • Barrier / fence permitIn review
For pool contractors

The County side of the job, handled

You hold the license and pull the permit. We do the paperwork, the follow-up and the tracking that eat up your week.

Pre-screen the lot

Before the engineer draws, we check zoning setbacks, easements, septic, trees and any open permits or code cases on the folio.

Build the package

Application, Owner's Certification, barrier method, survey and plans checked against what the County asks for, before anything is filed.

File and answer comments

We submit, watch plan review, and coordinate corrections with your engineer so comments get answered fast.

Sub-permits and barrier

We keep the electrical, plumbing, gas and fence permits lined up with the master permit, so nothing holds up the fill.

Track inspections

We follow every inspection, flag failed ones right away, and watch permit expiration dates for you.

Updates in your language

Plain status updates in English or Spanish, for you and for your homeowner, until the job is closed out.

Why packages come back

Most delays start with the same few mistakes

Every rejected package costs your crew time and can add fees. We check for these before the County ever sees the file.

  • Pool or deck inside the setbacksPool, deck and equipment dimensioned on the survey and checked against the zoning district.
  • Septic tank or drainfield not shownOn septic lots, the system has to be on the plans with the required distance from the pool wall.
  • No pool barrier method on the plansFence, safety cover or alarms named on the plans, with specs attached.
  • Paperwork that doesn't matchOutdated forms, missing notary, or an owner name that doesn't match the Property Appraiser.
  • Open permits or code cases on the folioAn old open permit on the property can hold up your new one. We look before you file.
How it works

Four steps from contract to final

  1. Send us the job

    Address or folio, the survey, and your plans or engineer's contact.

  2. We pre-screen

    We check the lot and tell you what the package needs before anything is filed.

  3. We file and follow up

    Submittal, plan review comments and corrections until the permit is issued.

  4. We track to close-out

    Sub-permits, inspections and the final, through the Certificate of Completion.

Every inspection, followed

  1. 01Steel / pre-gunite
  2. 02Electrical bonding
  3. 03Plumbing pressure test
  4. 04Deck steel
  5. 05Electrical final
  6. 06Barrier / fence final
  7. 07Building final

Typical order for a residential pool in unincorporated Miami-Dade. Your job's sequence may differ.

Pricing

One flat price per pool permit

For each residential pool permit in unincorporated Miami-Dade.

Standard

$950
per pool permit

From the first package to the final inspection, including scheduling and coordinating every inspection.

Returning contractors

$750
per pool permit

For contractors who have already worked with us. Same service, inspections coordinated too.

Need us on site for an inspection? It's $100 per visit, or $250 if the visit runs past 3 hours, waiting time included.

Our guarantee

  • If the mistake is ours, we fix it and resubmit for free within 2 business days.
  • If the permit isn't issued because of our error, we refund our full fee. This doesn't include fees paid to the County.
  • 2 rounds of corrections are included. From the third round on, it's $100 per round.
  • Not covered: design changes, the engineer's plans, documents the client didn't provide, or County delays.
About X Permits

Focused on pool permits

X Permits has worked on swimming pool permits in Miami-Dade since 2018. We're a small, bilingual team that knows the County process.

2018Working on pool permits since
EN · ESUpdates in English or Spanish
PoolsResidential pools, barriers and pool equipment
Contact

Have a pool coming up? Send it over.

Tell us the address and where the job stands. We'll tell you what the permit needs.

Phone(786) 250-8963
Emailxapyenpermits@gmail.com
Customer supportAvailable 24/7
Service areaUnincorporated Miami-Dade County. Cities coming later.
We'll get back to you as soon as we can.